ORENDA OSCII PROJECTS – BATTERY ENERGY STORAGE SYSTEM

Site

Bronx and Staten Island, New York

Project

ORENDA OSCII PROJECTS – BATTERY ENERGY STORAGE SYSTEM

Role

EPC Contractor
  • DCO. In JV with Jingoli Power, providing major equipment procurement and construction on BESS projects.
  • Includes high-tension metering enclosure, 15kV Vacuum Fault Interrupter padmount SWG, padmount
    15kV-480 V liquid filled step-up transformers, aux power transformers, UPS, and control systems.
  • Tesla Megapacks (2XL) pre-purchase by Owner.
  • All equipment installed outdoors on structural concrete pads with Code requirement fire protection systems.
  • BESS Systems will be utilized for energy dispatch.
  • Con Ed Utility Interconnection – 13.2 kV